ID Contact Name Title of Contact Person Contact Email Contact Phone Sponsoring Entity Address Project Name Project Description ARRA Funding Comments Contingency ODOT Award ARRA Match STP Match ARRA Remainder Award Date Project Number Federal Code
TUL07 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9653 City of Tulsa 2334 South Jackson Ave, S-103, Tulsa, OK 74107 064001-17B - Arterial Street Maintenance, (31st Street S from 129th E Ave to 145th E Ave) Arterial Street Maintenance $1,580,000   #REF! $552,769 $516,454 $36,316 ######## 8/3/2009 26706(04) STP-STIM(287)IG
TUL01 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9647 City of Tulsa 2328 South Jackson Ave, S-103, Tulsa, OK 74107 104001 - Arterial Street Maintenance, Mohawk Blvd (Cincinnati to Hartford) Rehab of the street with AC Patching, PCC Patching, Driveways, Milling & Overlay along with new traffic signalization $1,910,000   #REF! $736,057 $687,730 $48,327 ######## 8/3/2009 26700(04) STP-STIM(281)IG
          City of Sand Springs P.O. Box 338 Sand Springs, OK 74064 E 2nd St (Main St to Adams - 3,200 lf) Prepare existing pavement surface.  Complete Pavement Preservation & Restripe pavement. $313,283     $198,130 $185,046 $13,084 $128,237 8/3/2009 26697(06) STP-STIM(422)IG
SAN01 Douglas J. Enevoldsen City Manager djenevoldsen@sandspringsok.org (918) 246-2502 City of Sand Springs P.O. Box 338 Sand Springs, OK 74063 Airport Access Rd (Euchee Cr Blvd to NW - 16,500 lf) Prepare existing pavement surface.  Complete Pavement Preservation & Restripe pavement. $608,137 Sand Springs identified this project as their top priority. Sand Springs included a 10% contingency. $506,312 $472,877 $33,436 $135,261 8/3/2009 26697(04) STP-STIM(278)IG
SAP01 Tom DeArman City Manager tdearman@cityofsapulpa.net (918) 224-3040 City of Sapulpa 425 E. Dewey St. Sapulpa, OK 74066 E. Line St. from Mission St. to Moccasin Pl. Removing and replacing concrete pavement for a 2,560 foot stretch of E. Line St. from Mission St. to Moccasin Pl.  Only the existing roadway foot print will be removed and replaced. $698,540   Sapulpa included 10% contingency $482,705 $450,828 $31,877 $247,713 9/8/2009 26698(04) STP-STIM(279)IG
BRK04 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Kenosha Street Mill and Overlay, Hickory Court to Aspen Avenue (145th E. Ave.) Milling and 3" overlay on Kenosha Street (71st St. S.), a 5-lane primary arterial street in Broken Arrow, from Hickory Court to Aspen Avenue (145th E. Ave.), a distance of approximately 2,500 feet, to preserve the integrity of the roadway surface. $344,804   Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. $316,912 $295,984 $20,928 $48,820 9/8/2009 26687(04) STP-STIM(267)IG
BRK03 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Kenosha Street Mill and Overlay, Main Street to Sixth Street Milling and 3" overlay on Kenosha Street (71st St. S.), a 5-lane primary arterial street in Broken Arrow, from Main Street to Sixth Street, a distance of approximately 2,000 feet, to preserve the integrity of the roadway surface. $321,487   Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. $259,730 $242,578 $17,152 $78,909 9/8/2009 26686(04) STP-STIM(266)IG
TUL09 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9636 City of Tulsa 2317 South Jackson Ave, S-103, Tulsa, OK 74107 054009 & 054039, Arterial Street Maintenance, East 41st Street South from I-44 to Sheridan Road Arterial Street Maintenance, East 41st Street South from I-44 to Sheridan Roade and South Yale Avenue from 31st Street South to 36th Street South $518,428 Based on the Urbanized STP policy, Tulsa will be capped at $15,788,428 which is 70% of the available funding. ######## $0         ######## STP-STIM(289)IG
TUL08 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9654 City of Tulsa 2335 South Jackson Ave, S-103, Tulsa, OK 74107 054024 - Arterial Street Maintenance, (Harvard Ave from 11th St to Admiral Pl) Arterial Street Maintenance, Street mill & Overlay, New Sidewalk & Wheelchair ramps or replacement, recessed inlets $2,127,000   #REF! $0         26707(04) STP-STIM(288)IG
TUL06 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9652 City of Tulsa 2333 South Jackson Ave, S-103, Tulsa, OK 74107 064001-17H - Arterial Street Maintenance, (S Sheridan from 11th to 21st St) Arterial Street Maintenance, Pothole Repair, Minor sanitary sewer relocation, curbing, asphalt overlay $2,960,000   #REF! $0         26705(04) STP-STIM(286)IG
TUL05 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9651 City of Tulsa 2332 South Jackson Ave, S-103, Tulsa, OK 74107 054045 - Arterial Street Maintenance, Roundabout (Mingo Rd & Admiral Pl) Arterial Street Maintenance, Roundabout at Mingo Rd & Admiral Pl, Pothole Repair, additional drainage and asphalt overlay $1,170,000   #REF! $0         26704(04) STP-STIM(285)IG
TUL04 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9650 City of Tulsa 2331 South Jackson Ave, S-103, Tulsa, OK 74107 054035 - Arterial Street Maintenance, Sheridan Rd(11th St to Admiral Blvd) Arterial Street Maintenance $1,875,000   #REF! $0         26703(04) STP-STIM(284)IG
TUL03 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9649 City of Tulsa 2330 South Jackson Ave, S-103, Tulsa, OK 74107 054037 - Arterial Street Maintenance, SW Blvd (23rd St to Arkansas Bridge) Arterial Street Maintenance, Concrete Patching & Sidewalk Rehab $2,033,000   #REF! $0         26702(04) STP-STIM(283)IG
TUL02 Matt Liechti Lead Engineer, Transportation Design mliechti@ci.tulsa,ok.us (918) 596-9648 City of Tulsa 2329 South Jackson Ave, S-103, Tulsa, OK 74107 054040 - Arterial Street Maintenance, Yale Ave (Admiral Pl to Pine St)    Arterial Street Maintenance $1,615,000   #REF! $0         26701(04) STP-STIM(282)IG
TUC01 Ray Jordan Tulsa County Engineer rjordan@tulsacounty.org (918) 596-5730 Tulsa County 500 S Denver, Tulsa, OK 74103 West 41st Street Improvements 4-lane roadway improvement project on 41st Street S. from 41st W. Ave to 57th W. Ave.  This project will connect to existing 4-lane roadways between 41st W. Ave and 57th W. Ave.  Project will also provide traffic signal at 49th W. Ave and 41st Street S. which has an accident history in the past.  This project would provide a 4-lane connection from I-44 to State Highway 97. $640,422 Due to equity distribution, the recommended funding is capped at $640,422   $0         26699(04) STP-STIM(280)IG
ROC03 Mike Helm Rogers County District No. 2 Commissioner mhelm@rogerscounty.org (918) 443-2443 Rogers County 221 S. Missouri Room 1-109 Claremore, OK 74017 Rogers County Pine Street Roadway Relocation  Approx. 0.7 miles East of SH-66 and East of Catoosa, OK on Pine Street over an abandoned portion of I-44.  Construction of approx. 0.25 Mi. of a modern two-lane paved roadway.  Project will allow for the abandonment of an existing single lane bridge over the abandoned turnpike US-44. $63,553 Due to equity distribution, the recommended funding is capped at $63,553   $0         26696(04) STP-STIM(277)IG
JEN03 Mike Tinker City Manager mtinker@jenksok.org (918)299-5883 City of Jenks P.O. Box 2007 Jenks, OK 74037 5th Street Overlay 5th Street (Levee to "A" Street): 2,600 LF of 2-lane curb and gutter roadway. Asphalt pavement rehabilitation by removal of surface course by grinding, installation of separator fabric and application of new 2-inch surface course with thermoplastic striping and reflectors.  $150,000   Jenks included 15% contingency $0         26695(04) STP-STIM(276)IG
COW02 Kathleen Easley Community Development Director keasley@cityofcoweta-ok.gov (918) 486-3773 City of Coweta P.O. Box 850 Coweta, OK 74429 Asphalt overlay on 151st from Division to Broadway/Hwy 72 Asphalt overlay on 151st from Division to Broadway/Hwy 72 to include materials and labor $177,271 Coweta requested a 2014 estimate.  INCOG used the 2009 estimate provided by Coweta. Coweta included a 15% conteingency.   $0         26694(04) STP-STIM(274)IG
COW01 Kathleen Easley Community Development Director keasley@cityofcoweta-ok.gov (918) 486-3773 City of Coweta P.O. Box 850 Coweta, OK 74429 Traffic light improvements @ 141st & Hwy. 51 Existing traffic light to be improved with new pull boxes, new signal cable, traffic controls, pedestrian push button and sign, pedestrian head mount and detectors $21,146     $0         26693(04) STP-STIM(273)IG
CAT01 Rita Lamkin Mayor mayorlamkin@cityofcatoosa.org (918) 266-0806 City of Catoosa P.O. Box 190 Catoosa, OK 74015 Cherokee & South School Access Road Traffic Signals Add traffic signals to an existing intersection to improve safety and increase capacity $219,935 Project will need to meet warrants and Catoosa is prepared to proceed.   $0         26692(04) STP-STIM(272)IG
BRK10 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Signals at Elm Place and Stonewood Drive Installation of Signals at Elm Place (161st E. Ave.) a primary arterial and Stonewood Drive commercial street. $140,711   Broken Arrow included a 8% Contingency and 4% for Engineering, plans, specs, and bidding. $0         26691(04) STP-STIM(271)IG
BRK09 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Signls at New Orleans Street and 9th Street Installation of Signals at New Orleans Street (101st St. S.) a primary arterial and 9th (S. 177th E. Ave.) Street a secondary arterial. $140,711   Broken Arrow included a 8% Contingency and 4% for Engineering, plans, specs, and bidding. $0         26690(04) STP-STIM(270)IG
BRK08 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Signals at Albany Street and Stone Ridge Drive Installation of Signals at Albany Street (61st St. S.) a secondary arterial and Stone Ridge Drive a commercial collector. $140,711   Broken Arrow included a 8% Contingency and 4% for Engineering, plans, specs, and bidding. $0         26689(04) STP-STIM(269)IG
BRK05 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 9th Street and Houston Street Intersection Mill and Overlay Milling and 3" overlay of the 9th Street (S. 177th E. Ave.) and Houston Street (81st St. S.) intersection, a distance of approximately 2,000 feet on all 4 legs, to preserve the integrity of the roadway surface.  9th Street is a 5-lane secondary arterial street and Houston Street is a 3-lane secondary arterial street at the intersection. $314,857   Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. $0         26688(04) STP-STIM(268)IG
BRK02 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Elm Place and Houston Street Intersection Mill and Overlay Milling and 3" overlay of the Elm Place (161st E. Ave.) and Houston Street (81st St. S.) intersection, a distance of approximately 2,000 feet on all 4 legs, to preserve the integrity of the roadway surface.  Elm Place is a 5-lane primary arterial street and Houston Street is a 3-lane secondary arterial street at the intersection. $299,019   Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. $0         26685(04) STP-STIM(265)IG
BRK01 Thomas D. Hendrix, P.E. City Engineer thendrix@brokenarrowok.gov (918) 259-2400, Ext. 5414 City of Broken Arrow PO Box 610, Broken Arrow, OK 74013 Elm Place Mill and Overlay, New Orleans Street to Florence Street including the Florence Intersection Milling and 3" overlay on Elm Place (161st E. Ave.), a 4-lane primary arterial street in Broken Arrow, from Florence Street (111th St. S.) north to New Orleans Street (101st St. S.), a distance of approximately 5,000 feet, to preserve the integrity of the roadway surface.  Milling and 3" overlay of the Elm Place (161st E. Ave.) and Florence Street (111th St. S.) intersection, a distance of approximately 2,000 feet on all 4 legs, to preserve the integrity of the roadway surface. $1,257,450   Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. $0         26684(04) STP-STIM(264)IG
BIX01 Micky Webb City Manager mwebb@bixby.com (918) 366-4430 City of Bixby 116 W. Needles, Bixby, OK 74008 E. 131st Street and Memorial Intersection Widening Proposed construction included widening the east and west legs of the 131st and Memorial intersection from 2-lanes to 5-lanes.  The work will extend approximately 750-feet in each direction and include paving and drainage improvements.  Upon completion, the project will increase the level of service for east/west bound traffic, reducing congestion at the intersection. $538,000 Due to equity distribution, the recommended funding is capped at $538,000 Bixby included no contingency $0         26683(04) STP-STIM(263)IG
CRK01 Marilyn Smithee Office Director msmithee@swbell.net (918) 224-0278 Creek County 317 E. Lee, Suite 103 Sapulpa, OK 74066 West 81st Street South from SH-66 West to Frankhoma Road Widening of an existing road from 2-lanes with open ditches to 3-lanes with curbs and storm sewers.  Includes replacing obsolete drainage boxes as well as horizontal & vertical curve corrections.  The 3rd lane will be a two-way left turn lane to service a growing industrial park area that also includes residential traffic. $376,431 Due to equity distribution, the recommended funding is capped at $376,431   $0         22350(04) STP-STIM(275)IG
                        $3,052,615 $2,851,496 $201,120 ########