County Number Type Type of Work Facility Date Description Cost
Creek 25562(04) Bridge & Approaches Bridge SH-66 2010-04 SH-66 over I-44 (Turner Turnpike under) $11,554,000
Rogers 20315(A1) Bridge & Approaches Bridge I-44 2009-09 I-44: Bridge over 163rd Street (OK133) $10,400,000
Rogers 20899(04) Bridge & Approaches Bridge SH-66 2011-11 SH-66: Over Verdigris River & road under, 3.5 miles north of I-44 $4,034,420
Rogers 21898(04) Bridge & Approaches Bridge I-44 2013-01 I-44: Eastbound & Westbound Bridges at 177th East Ave. (Lynn Lane) IM EARMARK $9,000,000
Tulsa 11476(04) Bridge Redecking & Rehab. Bridge SH-51 2013-01 Tulsa BA Expwy/SH 51 over Lewis Avenue (both Bridges) Scoping by 11476(05) to maintain Br. Eligibility $3,420,000
Tulsa 11477(04) Bridge Redecking & Rehab. Bridge SH-51 2013-01 Tulsa BA Expwy/SH 51 over 15th Street & SH 51 over MK&T RR (2 Bridges) Scoping by 11476(05) to maintain Br. Eligibility $5,170,000
Tulsa 20336(04) Bridge Repair Bridge Various 2010-05 Division 8: Bridge repairs within Division 8 (sites to be selected later)   SMC=80/20 $1,000,000
Tulsa 20337(04) Bridge Repair Bridge Various 2009-01 Division 8: Bridge repairs within Division 8 (sites to be selected later)   SMC=80/20 $1,020,000
Tulsa 20925(04) Bridge Repair Bridge US-64 2010-04 US-64: Over Euchee Creek, 6.4 miles southeast of Osage County Line  (Box STR)  SMC-80/20 $371,000
Tulsa 20926(04) Bridge Painting Bridge Various 2011-05 Division 8: Bridge repair within Division 8 (sites to be selected later)   (Bridge painting) $1,120,000
Tulsa 21899(04) Bridge & Approaches Bridge I-44 2016-01 I-44: Bridge at 145th East Ave. approx. 0.7 mile east of Jct. of I-44/I-244 $9,000,000
Tulsa 21901(04) Bridge Repair Bridge Various 2012-01 Bridge Repair within Division 8 (sites to be selected later) $1,000,000
Tulsa 21923(04) Bridge & Approaches Bridge US-75 2012-01 US-75: Over Middle Duck Creek approx. 0.9 mile north of the Okmulgee C/L  80/20 SMC $3,929,400
Tulsa 23166(04) Bridge & Approaches Bridge SH-151 2013-01 SH-151 over SH-51 and over SL&SF RR approx. 1.5 mile east of the Creek C/L $4,985,000
Tulsa 23167(04) Bridge & Approaches Bridge SH-266 2013-01 SH-266 over US-169 approx. 5.8 mile north of Jct US-169/I-44   SMC 80/20 $1,710,000
Tulsa 23168(04) Bridge & Approaches Bridge US-64 2013-01 US-64/US-412/SH-51 over abandoned railroad approx. 15.0 mile east of Osage C/L $1,700,000
Tulsa 23171(04) Bridge & Approaches Bridge I-244 2013-01 I-244 over I-244 ramp W-N approx. 5.39 mile east of Jct. I-244/I-444. $1,710,000
Tulsa 23182(04) Bridge & Approaches Bridge I-244 2013-01 I-244 over an abandoned railroad approx 5.5 mile north of I-44 $1,680,000
Tulsa 23184(04) Bridge Repair Bridge Various 2013-01 Bridge Repair within Division 8 (sites to be selected later) $1,000,000
Tulsa 23185(06) Bridge Water Proof Seal Bridge Various 2009-01 2009 Division 8 Silane Projects (Bridges to be determined later) $102,000
Tulsa 23185(07) Bridge Water Proof Seal Bridge Various 2010-04 2010 Division 8 Silane Projects (Bridges to be determined later) $100,000
Tulsa 23185(08) Bridge Water Proof Seal Bridge Various 2011-04 2011 Division 8 Silane Projects (Bridges to be determined later) $112,000
Tulsa 23185(09) Bridge Water Proof Seal Bridge Various 2012-01 2012 Division 8 Silane Projects (Bridges to be determined later) $118,000
Tulsa 23185(10) Bridge Water Proof Seal Bridge Various 2013-01 2013 Division 8 Silane Projects (Bridges to be determined later) $100,000
Tulsa 24348(04) Bridge Painting Bridge SH-11 2014-01 Division 8: Bridge Paint and Joint Repair $1,000,000
Tulsa 24365(04) Bridge & Approaches Bridge SH-11 2013-01 SH-11 over Hominy Creek approx. 7.4 mile south of the Washington C/L $2,500,000
Tulsa 24365(07) Bridge & Approaches Bridge SH-11 2013-01 SH-11 over Flat Rock Creek approx. 15.2 mile south of the Washington C/L $1,150,000
Tulsa D8002(04) Bridge Redecking & Rehab. Bridge I-244 2016-01 I-244 over Arkansas River (One Bridge) IM EARMARK $16,000,000
Tulsa D8010(04) Bridge Redecking & Rehab. Bridge I-244 2012-01 I-244 from US-75 north to 1st Street in Tulsa (North East Leg of IDL) IM EARMARK $6,321,429
Wagoner 10004(10) Bridge & Approaches Bridge SH-51 2009-08 SH-51: Fr approx. 7.3 mis. East of Coweta Ext. East 2.6 mile (replace existing bridge over Verdigris River), corridor RTE SMC 80/20 $7,800,000
Wagoner 10004(12) Bridge & Approaches Bridge SH-51 2011-01 SH-51: over Billy Creek approx. 11.9 mile east of Jct. SH-51/SH-72 Corr Rte  SMC 80/20 $2,844,800
      Bridge        $111,952,049
Osage 24267(04) Widen & Resurface Construction SH-20 2016-01 SH-20 from 4.06 mi. west of the Tulsa C/L, east 2.4 mi. $2,160,000
Rogers 09484(A1) Grade, Drain & Surface Construction SH-20 2014-01 SH-20: From approx. 1 mi. east of the Verdigris River east to Claremore $17,800,000
Rogers 18887(05) Grade, Draining, Bridge & Surface Construction SH-88 2009-09 SH-88 from 3.5 mi. northwest of US-412, extend north 4.6 miles  SMC=80/20 $16,000,000
Rogers 19983(11) Interchange Construction SH-412P 2014-01 SH-412P, Interchange at US-412, 5.37 mi. east of I-44 (Phase 2) $1,000,000
Rogers 20290(04) Interchange Construction I-44 2009-03 I-44: 193rd Street Interchange in the City of Tulsa (SH-167) **Funding Split Required** (OK083.OK109) IM EARMARK $48,425,960
Rogers 20315(04) Interchange Construction I-44 2015-01 I-44: Interchange at 163rd Street  Split funding required   SMC=90/10, 80/20 $10,500,000
Rogers 23160(04) Grade, Drain & Surface Construction SH-66 2013-01 SH-66 Under SH-266, Add Turn Lane $122,000
Rogers 24299(04) Paving Rehabilitation Construction SH-66 2009-09 SH-66: Beg approx. 11.0 mile north of I-44 & ext north 3.2 mile $4,300,000
Rogers D8100(00) Money Only Construction Local 2010-09 Partnership with City of Claremore for railroad grade separation from approx. County Club Road north to approx. Blue Starr in Claremore $15,000,000
Tulsa 06374(08) Grade, Draining, Bridge & Surface Construction I-44 2011-01 I-44: Brs C & D at Darlington Avenue & rdy fr. Just east of Yale to just west of Sheridan Rd. in Tulsa (rdy to 6 Lns)  IMEARMARK $24,763,200
Tulsa 06374(44) Reconstruct-Added Lanes Construction I-44 2010-01 I-44: From Arkansas River, extend east 1.1 miles to east of Peoria Avenue (reconst to 6 lanes)?? Fund Split ??  SMC=90/10 IM earmark $42,968,654
Tulsa 06374(47) Grade, Draining, Bridge & Surface Construction I-44 2011-05 I-44: at Lewis Avenue (Reconstruct to 6 Lanes) SMC=90/10  ??Fund Split??  (H-71) $34,787,678
Tulsa 06374(50) Grade, Draining, Bridge & Surface Construction I-44 2009-05 I-44: at Harvard Avenue  (Reconstruct to 6 Lanes)  Fund Split  SMC=90/10 (OK142) $47,910,000
Tulsa 10981(05) Interchange Construction I-44 2016-01 Tulsa: I-44 at US-169 Interchange (Reconstruct) $5,960,000
Tulsa 11143(07) Grade, Drain & Surface Construction SH-51 2015-01 SH-51 from 1.9 mi. east of the Creek C/L, East 5.9 mi. recon exist lanes $6,000,000
Tulsa 17387(04) Interchange Construction US-75 2009-09 Interchange at US-75 & 111th Street South in Jenks.  S-35  SMC 80/20 $14,350,800
Tulsa 20930(04) Widen & Resurface Construction US-169 2009-09 US-169: from I-244 to 36th Street North (Six Lane) $10,800,000
Tulsa 20931(04) Interchange Construction US-169 2015-01 US-169: Interchange at Broken Arrow Expressway  SMC=80/20 $25,000,000
Tulsa 23163(04) Grade, Drain & Surface Construction US-64 2008-11 US-64: Beg. At Creek Turnpike & extend south to just south of 111th St. in Bixby  SMC 80/20 $4,500,000
Tulsa 23169(05) Paving Rehabilitation Construction Various 2012-01 Concrete rehabilitation projects within Division 8 (sites to be selected later $295,000
Tulsa 23169(06) Paving Rehabilitation Construction Various 2013-01 Concrete rehabilitation projects within Division 8 (sites to be selected later $250,000
Tulsa 24300(04) Interchange Construction US-75 2012-01 US-75 Interchange at 116th Street North $7,670,000
Tulsa 24346(04) Grade, Drain & Surface Construction SH-20 2016-01 SH-20 from 0.13 mi. east of US-75, east 3.5 mi. $9,000,000
Tulsa 24349(04) Grade, Draining, Bridge & Surface Construction I-244 2014-01 I-244 from US-75 north to 1st Street in Tulsa (West Leg of IDL) IM EARMARK $10,000,000
Tulsa 24416(04) Grade, Draining, Bridge & Surface Construction I-244 2015-01 I-244 from 1st Street north & east to US-75 in Tulsa (NW Quad of IDL)  IMEARMARK $20,000,000
Tulsa 24417(04) Widen & Resurface Construction US-169 2013-01 US-169: from 36th North 2.0 mile to 56th Street $6,000,000
Tulsa D8005(04)   Construction SH-97 2011-09 SH-97: From 2nd Street Ext South to Morrow Drive in Sand Springs (PH) $5,000,000
      Construction        $390,563,292
Creek 24425(05) Right of Way RoW US-75A 2013-01 US-75A: from the Okmulgee C/L, North Approx 5.17 mi, to Kiefer ROW for 24425(04) $500,000
Osage 24267(05) Right of Way RoW SH-20 2014-01 SH-20 from 4.06 mi. west of the Tulsa C/L, east 2.4 mi ROW for 24267(04) $130,000
Rogers 20315(05) Right of Way RoW I-44 2010-11 I-44: Interchange at 163rd Street in the City of Tulsa (RW for 20315(04)  SMC=80/20 $4,816,000
Rogers 21898(05) Right of Way RoW I-44 2012-01 I-44: Eastbound & Westbound Bridges at 177th East Ave. (Lynn Lane) R/W for 21898(04) IM EARMARK $4,915,880
Tulsa 10980(10) Right of Way RoW I-44 2016-01 Tulsa: I-44 at Broken Arrow Expressway Interchange R/W for 10980(05)  State Advance Aquire=10980(06) $4,165,000
Tulsa 10981(06) Right of Way RoW I-44 2014-01 Tulsa: I-44 at US-169 Interchange  RW for 10981(05) $3,300,000
Tulsa 20931(05) Right of Way RoW US-169 2013-01 US-169: Interchange at Broken Arrow Expressway RW for 20931(04)  (PH)   SMC=80/20 $4,000,000
Tulsa 21899(05) Right of Way RoW I-44 2013-01 I-44: Bridge at 145th East Ave. approx. 0.7 mile east of Jct. of I-44/I-244 R/W for 21899(04) $4,165,000
Tulsa 23167(05) Right of Way RoW SH-266 2011-06 SH-266 over US-169 approx. 5.8 mile north of Jct US-169/I-44 (RW for 23167(04) $445,760
Tulsa 23168(05) Right of Way RoW US-64 2011-05 US-64/US-412/SH-51 over abandoned railroad approx. 15.0 mile east of Osage C/L  (RW for 23168(04)) $445,760
Tulsa 23183(04) Right of Way RoW Various 2016-01 Right-of-Way Projects within Division 8 (Sites to be selected later) $3,500,000
Tulsa 24300(05) Right of Way RoW US-75 2010-04 US-75 Interchange at 116th Street North (RW for 24300(04)) $106,000
Tulsa 24346(05) Right of Way RoW SH-20 2013-01 SH-20 from 0.13 mi. east of US-75, East 3.5 mi. ROW for 24346(04) $2,000,000
Tulsa 24365(05) Right of Way RoW SH-11 2011-05 SH-11 over Hominy Creek approx. 7.4 mile south of the Washington C/L (RW for 24365(04) $269,920
Tulsa 24365(08) Right of Way RoW SH-11 2011-05 SH-11 over Flat Rock Creek approx. 15.2 mile south of the Washington C/L (RW for 24365(07)) $269,920
      RoW        $33,029,240
Tulsa 22508(05) Safety Improvement Safety US-169 2009-09 US-169: Soundwalls between Memorial & Mingo Road in Tulsa $3,200,000
Tulsa 23165(04) Safety Improvement Safety Various 2010-09 Safety Improvements within Division 8 (sites to be selected later) $1,000,004
Tulsa 23170(04) Safety Improvement Safety Various 2012-01 Safety Improvement Projects within Division 8 (sites to be selected later) $118,000
Tulsa D8100(01) Safety Improvement Safety I-244 2009-09 Safety Improvements within Division 8 (sites to be selected later) $1,000,000
      Safety        $5,318,004
Creek 24425(06) Utilities Utilities US-75A 2013-01 US-75A: from the Okmulgee C/L, North Approx 5.17 mi, to Kiefer UT for 24425(04) $400,000
Osage 24267(06) Utilities Utilities SH-20 2015-01 SH-20 from 4.06 mi. west of the Tulsa C/L, east 2.4 mi UT for 24267(04) $87,000
Rogers 20315(06) Utilities Utilities I-44 2012-01 I-44: Interchange at 163rd Street UT for 20315(04)  SMC=80/20 $2,559,491
Rogers 20899(06) Utilities Utilities SH-66 2009-09 SH-66: Over Verdigris River & road under, 3.5 miles north of I-44 (UT for 20899(04)) $722,647
Rogers 21898(06) Utilities Utilities I-44 2012-01 I-44: Eastbound & Westbound Bridges at 177th East Ave. (Lynn Lane) UT for 21898(04) IM EARMARK $2,382,420
Tulsa 06374(49) Utilities Utilities I-44 2008-11 I-44: at Lewis Avenue (Reconstruct to 6 Lanes) for UT  06374(47) ?? NH ??  SMC=90/10 (OK101) $2,663,481
Tulsa 10980(07) Utilities Utilities I-44 2016-01 Tulsa: I-44 at Broken Arrow Expressway Interchange UT for 10980(05) $2,019,000
Tulsa 10981(07) Utilities Utilities I-44 2014-01 Tulsa: I-44 at US-169 Interchange UT for 10981(05) $2,018,000
Tulsa 20931(06)  Utilities Utilities US-169 2013-01 US-169: Interchange at Broken Arrow Expressway UT for 20931(04)  (PH)   SMC=80/20 $1,500,000
Tulsa 21899(06) Utilities Utilities I-44 2013-01 I-44: Bridge at 145th East Ave. approx. 0.7 mile east of Jct. of I-44/I-244 UT for 21899(04) $2,019,000
Tulsa 21923(05) Utilities Utilities US-75 2010-08 US-75: Over Middle Duck Creek approx. 0.9 mile north of the Okmulgee C/L  (UT for 21923(04) $766,380
Tulsa 23167(06) Utilities Utilities SH-266 2011-06 SH-266 over US-169 approx. 5.8 mile north of Jct US-169/I-44 (UT for 23167(04) $400,960
Tulsa 23168(06) Utilities Utilities US-64 2011-05 US-64/US-412/SH-51 over abandoned railroad approx. 15.0 mile east of Osage C/L  (UT for 23168(04)) $400,960
Tulsa 24300(06) Utilities Utilities US-75 2010-04 US-75 Interchange at 116th Street North (UT for 24300(04)) $108,120
Tulsa 24346(06) Utilities Utilities SH-20 2014-01 SH-20 from 0.13 mi. east of US-75, east 3.5 mi. UT for 24346(04) $1,500,000
Tulsa 24365(06) Utilities Utilities SH-11 2011-06 SH-11 over Hominy Creek approx. 7.4 mile south of the Washington C/L (UT for 24365(04) $152,320
Tulsa 24365(09) Utilities Utilities SH-11 2011-05 SH-11 over Flat Rock Creek approx. 15.2 mile south of the Washington C/L (UT for 24365(07)) $152,320
Utilities        $19,852,099
Grand Total $560,714,684