County Job # Project No. 2011-2014 Program LENGTH Work Type Facility Description Fiscal Year Project Total Fund Code Federal  State  Other  Totals
TMA 23185(08) J2 -3185 (008) Bridge 0 Bridge Water Proof Seal Various 2011 division 8 silane projects (bridges to be determined later) 2011 $103,000 0L1C0 $103,000 $0 $0 $103,000
Tulsa 21923(04) BRFY -172N (272) Bridge 0.05 Bridge & Approaches US-75 US-75: over south duck creek (aka middle duck creek), approx. 0.9 miles north of the Okmulgee county line 2012 ######## 0L1C0 $5,830,000 $0 $0 $5,830,000
Tulsa 26304(05) BHIY -0244-2(484) 005 Bridge 0.2 Bridge Rehabilitation I-244 I-244: 1-244/US-75 exit to 1st street (NE corner of IDL) IM earmark 2012 ######## 0L1C0 $6,700,715 $0 $0 $6,700,715
TMA 23185(10) J2 -3185 (010) Bridge 1.2 Bridge Water Proof Seal Various 2013 division 8 silane projects (bridges to be determined later) 2013 $109,000 0L1C0 $109,000 $0 $0 $109,000
Tulsa 11476(04) BHFY -015N (008) Bridge 0.1 Bridge Rehabilitation SH--51 Tulsa: Broken Arrow Expressway /SH-51 over Lewis avenue (both bridges) scoping by 11477(05) to maintain br eligibility 2013 ######## 0L1C0 $3,727,800 $0 $0 $3,727,800
Tulsa 23167(04) BRFY -172A (319) Bridge 0.5 Bridge & Approaches SH-266 SH-266 over US-169 approx. 5.8 mile north of jct US-169/I-44. 2013 ######## 0L1C0 $3,815,000 $0 $0 $3,815,000
Tulsa 23171(04) BRIY -0244-1(006) 101 Bridge 0.5 Bridge & Approaches I-244 I-244 over I-244 ramp w-n approx. 5.39 mile east of jct I-244/I-444. 2013 ######## 0L1C0 $1,863,900 $0 $0 $1,863,900
Tulsa 24365(04) BRFY -172C (365) Bridge 0.5 Bridge & Approaches SH--11 SH-11: over Hominy Creek approx. 7.4 miles south of the Washington c/l 2013 ######## 0L1C0 $2,725,000 $0 $0 $2,725,000
Tulsa 24365(07) BRFY -172B (368) Bridge 0.5 Bridge & Approaches SH--11 SH-11: over Flat Rock Creek, approx. 15.2 miles south of the Washington c/l 2013 ######## 0L1C0 $1,253,500 $0 $0 $1,253,500
TMA 24348(04) J2 -4348 (004) Bridge 0.2 Bridge Painting Various Division 8: bridge paint and joint repair 2014 $500,000 0L1C0 $500,000 $0 $0 $500,000
      Bridge                $26,627,915 $0 $0 $26,627,915
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2011     $650,000 $0 $162,500 $812,500
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2012     $650,000 $0 $162,500 $812,500
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2013     $650,000 $0 $162,500 $812,500
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2014     $650,000 $0 $162,500 $812,500
      CMAQ                $2,600,000 $0 $650,000 $3,250,000
Tulsa 06374(47) IMY -0044-2(399) 226 Interstate Maintenance 1.2 Grade, Draining, Bridge & Surface I-44 I-44: at Lewis Avenue (reconstruct to 6 lanes) ??Fund split?? IM earmark 2011 ######## 0L010 and OL050 $51,697,928 $0 $0 $51,697,928
Tulsa 06374(82) J -6374 (082) Interstate Maintenance 1.06 Grade, Drain & Surface I-44 I-44: Darlington Avenue from just east of Yale to just west of Sheridan rd in Tulsa (roadway to 6 lanes)**funding agreement needed** 2011 ######## 0L010 and OL051 $11,694,620 $0 $0 $11,694,620
Rogers 21898(05) IMY -0044-2(485) 238 RW Interstate Maintenance 0.1 Right Of Way I-44 I-44: eastbound & westbound bridges at 177th east Ave. (Lynn lane) r/w for 21898(04) IM earmark 2012 ######## 0L010 $4,415,960 $0 $0 $4,415,960
Rogers 21898(06) IMY -0044-2(486) 238 UT Interstate Maintenance 0.1 Utilities I-44 I-44: eastbound & westbound bridges at 177th east Ave. (Lynn lane) utilities for 21898(04) IM earmark 2012 ######## 0L010 $2,140,140 $0 $0 $2,140,140
Rogers 21898(04) IMY -0044-2(437) 238 Interstate Maintenance 0.1 Bridge & Approaches I-44 I-44: eastbound & westbound bridges at 177th east Ave.(Lynn lane) IM earmark 2013 ######## 0L010 $9,810,000 $0 $0 $9,810,000
Tulsa 21899(05) IMY -0044-2(487) 236 RW Interstate Maintenance 0.5 Right Of Way I-44 I-44: bridge at 145th east Ave. Approx. 0.7 mile east of jct of I-44/I-244 (r/w for 2189904) IM earmark 2013 ######## 0L010 $4,539,850 $0 $0 $4,539,850
Tulsa 21899(06) IMY -0044-2(488) 236 UT Interstate Maintenance 0.5 Utilities I-44 I-44: bridge at 145th east Ave. Approx. 0.7 mile east of jct of I-44/I-244 (ut for 2189904) IM earmark 2013 ######## 0L010 $2,200,710 $0 $0 $2,200,710
Rogers 20315(04) IM-NHIY -0044-2(422) 238 Interstate Maintenance 0.4 Interchange I-44 I-44: interchange at 163rd Street split funding required IM earmark 2014 ######## 0L010 and OL050 $10,500,000 $0 $0 $10,500,000
Tulsa 10980(07) IMY -0044-2(361) 230 UT Interstate Maintenance 0.3 Utilities I-44 Tulsa: I-44 at Broken Arrow Expressway interchange Utilities for 10980(05) 2014 ######## 0L010 $2,019,000 $0 $0 $2,019,000
Tulsa 10980(10) IMY -0044-2(360) 230 RW Interstate Maintenance 0.1 Right Of Way I-44 Tulsa: I-44 at Broken Arrow Expressway interchange right of way for 10980(05) state advance acquisition 10980(06) IM earmark 2014 ######## 0L010 $4,165,000 $0 $0 $4,165,000
Tulsa 10981(06) IMY -0044-2(362) 233 RW Interstate Maintenance 0.3 Right Of Way I-44 Tulsa: I-44 at US-169 interchange right of way for 10981(05) 2014 ######## 0L010 $3,300,000 $0 $0 $3,300,000
Tulsa 10981(07) IMY -0044-2(363) 233 UT Interstate Maintenance 0.3 Utilities I-44 Tulsa: I-44 at US-169 interchange utilities for 10981(05) IM earmark 2014 ######## 0L010 $2,018,000 $0 $0 $2,018,000
      Interstate Maintenance                $108,501,208 $0 $0 $108,501,208
Tulsa 26303(08) J2 -6303 (008) Maintenance 1 Pavement Rehabilitation SH--51 SH-51: (Broken Arrow Exp.) From Peoria east to Lewis Ave. 2013 ######## 0L050 $7,380,390 $0 $0 $7,380,390
      Maintenance                $7,380,390 $0 $0 $7,380,390
Rogers 20315(05) NHIY -0044-2(423) 238 RW National Highway 0.04 Right Of Way I-44 I-44: interchange at 163rd street in the city of Tulsa (right of way for 20315(04) IM earmark 2012 ######## 0L050 $4,558,000 $0 $0 $4,558,000
Rogers 20315(06) NHIY -0044-2(424) 238 UT National Highway 0.04 Utilities I-44 I-44: interchange at 163rd street utilities for 20315(04) IM earmark 2012 ######## 0L050 $2,299,204 $0 $0 $2,299,204
Tulsa 24300(04) NHY -014N (071) National Highway 0.5 Interchange US-75 US-75 interchange at 116th street north 2012 ######## 0L050 $7,950,000 $0 $0 $7,950,000
Tulsa 20931(05) NHY -030N (045) RW National Highway 0.5 Right Of Way US-169 US-169: interchange at Broken Arrow Expressway right of way for 20931(04) 2013 ######## 0L050 $4,005,750 $0 $0 $4,005,750
Tulsa 20931(06) NHY -030N (046) UT National Highway 0.5 Utilities US-169 US-169: interchange at Broken Arrow Expressway Utilities for 20931(04) 2013 ######## 0L050 $1,504,200 $0 $0 $1,504,200
      National Highway                $20,317,154 $0 $0 $20,317,154
Tulsa 11768(26) PL -0060 (036) IL Planning 0 Metro Planning PLAN State FY 2012 (July 1, 2011 -June 30, 2012) metro planning tulsa urbanized area 2011 $850,000 0L450 $850,000 $0 $212,500 $1,062,500
Tulsa 11768(27) PL -0060 (037) IL Planning 0 Metro Planning PLAN State FY 2013 (July 1, 2012 -June 30, 2013) metro planning tulsa urbanized area 2012 $850,000 0L450 $850,000 $0 $212,500 $1,062,500
Tulsa 11768(28) PL -0060-(038) IL Planning 0 Metro Planning PLAN State FY 2014 (July 1,2013 - June 30, 2014) metro planning Tulsa urbanized area 2013 $850,000 OL450 $850,000 $0 $212,500 $1,062,500
Tulsa 11768(29) PL -0060 (039) IL Planning 0 Metro Planning PLAN State FY2015 (July 1, 2014 -June 30, 2015) metro planning Tulsa urbanized area 2014 $850,000 0L45E $850,000 $0 $212,500 $1,062,500
      Planning                $3,400,000 $0 $850,000 $4,250,000
Rogers  27167(05) J2 -7167 (005) Surface Transportation Program 0.1 Right Of Way SH-20 SH-20: intersection at SH-20 & clubhouse/Southaven road, approx. 9.5 miles east of Tulsa county line (right of way for 27167(04) 2011 $257,500 0L240 $257,500 $0 $0 $257,500
Rogers  27167(06) J2 -7167 (006) Surface Transportation Program 0.1 Utilities SH-20 SH-20: intersection at SH-20 & clubhouse/Southaven road, approx. 9.5 miles east of Tulsa county line (utilities for 27167(04) 2011 $257,500 0L240 $257,500 $0 $0 $257,500
Tulsa 26505(04) STPY -172B (461) Surface Transportation Program 0.33 Grade, Drain & Surface SH-97 SH-97: from 2nd street south to Morrow Drive in Sand Springs 2011 ######## 0L240 $7,000,910 $0 $0 $7,000,910
Tulsa 27053(05) J2 -7053 (005) Surface Transportation Program 1.8 Right Of Way SH-266 SH-266: from approx. 0.3 mi. East of us169, ext. East approx. 2.25 miles (.45 mi. In Rogers co.) Row for 27053(04) 2012 $212,000 0L240 $212,000 $0 $0 $212,000
Tulsa 27066(05) J2 -7066 (005) Surface Transportation Program 0.25 Right Of Way SH-11 SH-11: Delaware creek, 11 mi. South of Washington county line right of way for 27066(04) 2012 $53,000 0L1C0 $53,000 $0 $0 $53,000
Tulsa 27053(06) J2 -7053 (006) Surface Transportation Program 1.8 Utilities SH-266 SH-266: from approx. 0.3 mi. East of us169, ext. East approx. 2.25 miles (.45 mi. In Rogers co.) Ut for 27053(04) 2012 $212,000 0L240 $212,000 $0 $0 $212,000
Tulsa 27066(06) J2 -7066 (006) Surface Transportation Program 250 Utilities SH-11 SH-11: Delaware creek, 11 mi. South of Washington county line Utilities for 27066(04) 2012 $53,000 0L1C0 $53,000 $0 $0 $53,000
Creek  24425(05) STPY -119C (164) Surface Transportation Program 5.17 Right Of Way US-75A US-75A: from the Okmulgee county line, north approx 5.17 miles, to Kiefer (rw for 2442504) 2013 $501,400 0L240 $501,400 $0 $0 $501,400
Creek  24425(06) STPY -119C (165) UT Surface Transportation Program 5.17 Utilities US-75A US-75A: from the Okmulgee county line, north approx 5.17 miles, to Kiefer (ut for 2442504) 2013 $400,030 0L240 $400,030 $0 $0 $400,030
Rogers 24957(05) J2 -4957 (005) Surface Transportation Program 0.49 Right Of Way SH-266 SH-266: Verdigris River overflow, 5.9 mile east of Tulsa County line right of way for 24957(04) 2013 $218,000 0L1C0 $218,000 $0 $0 $218,000
Rogers 27167(04) J2 -7167 (004) Surface Transportation Program 0.1 Intersection SH--20 SH-20: intersection at SH-20 & clubhouse/Southaven road, approx. 9.5 miles east of Tulsa county line 2013 ######## 0L240 $3,000,770 $0 $0 $3,000,770
Rogers 24957(06) J2 -4957 (006) Surface Transportation Program 0.49 Utilities SH-266 SH-266: verdigrI- river overflow, 5.9 mile east of Tulsa county line Utilities for 24957(04) 2013 $109,000 0L1C0 $109,000 $0 $0 $109,000
Wagoner 20916(05) STPY -173C (088) RW Surface Transportation Program 1.77 Right Of Way SH--72 SH-72 beg approx 2.15 mile north of Muskogee c/l & ext north 1.77 mile(rw for 20916(04) 2013 $687,089 0L240 $687,089 $0 $0 $687,089
Wagoner 20916(06) STPY -173C (089) UT Surface Transportation Program 1.77 Utilities SH--72 SH-72 beg approx. 2.15 mile north of Muskogee c/l & ext. North 1.77 mile(ut for 20916(04) 2013 $497,708 0L240 $497,708 $0 $0 $497,708
Wagoner 27580(04) STPY -173A (164) 3R Surface Transportation Program 0.4 Resurface SH--72 SH-72: begin at Pecan Street in Coweta, extend north 0.4 miles 2013 $350,000 0L24E $350,000 $0 $0 $350,000
Osage  27168(05) J2 -7168 (005) Surface Transportation Program 0.25 Right Of Way SH-20 SH-20: intersection at SH-20 & Jayvine hill road right of way for 27168(04) 2014 $100,000 0L240 $100,000 $0 $0 $100,000
Osage  27168(06) J2 -7168 (006) Surface Transportation Program 0.25 Utilities SH-20 SH-20: intersection at SH-20 & Jayvine hill road utilities for 27168(04) 2014 $100,000 0L240 $100,000 $0 $0 $100,000
Rogers 09484(10) STPY -166B (241) Surface Transportation Program 4.83 Grade, Drain & Surface SH-20 SH-20: from approx. 1 mi east of the Verdigris River east to Claremore 2014 ######## 0L240 $20,300,000 $0 $0 $20,300,000
      Surface Transportation Program                $34,309,907 $0 $0 $34,309,907
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2011     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2011     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2011     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2011     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2011     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2011     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2011     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2011     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2011     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2011     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2011     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2011     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2011     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2011     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2011     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2011     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2011     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2011     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2011     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2011     $500,000 $0 $220,000 $720,000
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2012     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2012     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2012     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2012     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2012     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2012     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2012     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2012     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2012     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2012     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2012     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2012     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2012     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2012     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2012     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2012     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2012     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2012     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2012     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2012     $500,000 $0 $220,000 $720,000
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2013     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2013     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2013     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2013     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2013     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2013     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2013     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2013     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2013     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2013     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2013     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2013     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2013     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2013     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2013     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2013     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2013     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2013     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2013     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2013     $500,000 $0 $220,000 $720,000
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2014     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2014     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2014     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2014     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2014     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2014     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2014     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2014     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2014     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2014     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2014     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2014     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2014     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2014     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2014     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2014     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2014     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2014     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2014     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2014     $500,000 $0 $220,000 $720,000
      Transit                $27,844,000 $0 $7,341,000 $35,185,000
Osage  TBD Tulsa Urbanized STP   Grade, Drain & Surface Gilcrease West Expressway Edison St. to Tisdale Parkway Engineering, design, right-of-way, utility relocation, and construction of 2-lane parkway with shoulders and ultimate 4-lane access controlled expressway. 2011     $6,000,000 $0 $1,500,000 $7,500,000
Tulsa TBD Jenks Urbanized STP   Grade, Drain & Surface Main St. from Elm St. to Koa St. Right-of-way and construction to widen to 4 to 5-lanes with sidewalks, drainage, and signage. 2011     $1,833,500 $0 $435,500 $2,269,000
Tulsa TBD Jenks Urbanized STP   Grade, Drain & Surface Main St. from US-75 to Houston St. Right-of-way and construction to widen to 4-lanes with sidewalks, drainage, and signage. 2011     $1,906,000 $0 $450,000 $2,356,000
Tulsa TBD Jenks Urbanized STP   Intersection Elwood Ave. and 111th St. Intersection Engineering, design, and right-of-way for construction of intersection to 4 to 5-lane roadway with turn lanes, bridge replacements, sidewalks, drainage improvements and signage. 2011     $512,000 $0 $128,000 $640,000
Tulsa TBD Sand Springs Urbanized STP   Grade, Drain & Surface SH-97(Wilson Ave.) from W. 2nd St. to Morrow Rd. Coneptula plans, right-of-way, and phase 1 utility relocation for ultimate widening to 6-lanes including 5 intersections, signailzation, and sidewalks. 2011     $1,600,000 $0 $400,000 $2,000,000
Osage  TBD Tulsa Urbanized STP   Grade, Drain & Surface Gilcrease West Expressway Engineering design, right-of-way acquisition, utility relocation, and construction from Edison Street to LL Tisdale Parkway 2012     $6,000,000 $0 $1,500,000 $7,500,000
Rogers TBD Rogers County Urbanized STP   Grade, Drain & Surface 161st East Avenue/Pine Street Intersection Construct roadway with shoulders and signalization of intersection 2012     $720,000 $0 $180,000 $900,000
Tulsa TBD Broken Arrow Urbanized STP   Grade, Drain & Surface 23rd (193rd) Street Widening 23rd to 3 lanes from Kenosha (71st) to Houston (81st) and replacement of the bridge over SH-51 2012     $1,377,931 $0 $344,483 $1,722,414
Tulsa TBD Jenks Urbanized STP   Intersection Elwood Ave/111th St. Intersection Widening intersection to 4-5 lanes, with turn lanes, signalization, and other improvements 2012     $1,728,600 $0 $402,000 $2,130,600
Osage  TBD Tulsa Urbanized STP   Grade, Drain & Surface Gilcrease West Expressway Engineering design, right-of-way acquisition, utility relocation, and construction from Edison Street to LL Tisdale Parkway 2013     $6,000,000 $0 $1,500,000 $7,500,000
Rogers TBD Catoosa Urbanized STP   Grade, Drain & Surface 161st East Avenue I-44 to Pine Reconstruction to 4-lanes, curb and gutter, storm sewer, intersection improvement at Pine including dedicated left turn lanes, concrete pavement and large turning radii. 2013     $1,731,382 $0 $998,689 $2,730,071
Tulsa TBD Broken Arrow Urbanized STP   Grade, Drain & Surface 23rd Street from Kenosha to Houston  Widening of 23rd Street (193rd E. Ave) to 5-lanes and replacement of bridge to 4-lanes over SH-51. 2013     $2,499,982 $0 $624,996 $3,124,978
Tulsa TBD Jenks Urbanized STP   Intersection Main & Koa St. Signalization Engineering, design, and construction of signals including video detection and controls. 2013     $238,600 $0 $4,000 $242,600
Urbanized Surface Transportation Program                $34,997,918 $0 $9,075,999 $44,073,917
Grand Total $265,978,492 $0 $17,916,999 $283,895,491