County Job # Project No. Program LENGTH Work Type Facility Description Fiscal Year Project Total Fund Code Federal  State  Other  Fund Totals
Creek  24425(05) STPY -119C (164) Surface Transportation Program 5.17 Right Of Way US-75A US-75A: from the Okmulgee county line, north approx 5.17 miles, to Kiefer (rw for 2442504) 2013 $501,400 0L240 $501,400 $0 $0 $501,400
Creek  24425(06) STPY -119C (165) UT Surface Transportation Program 5.17 Utilities US-75A US-75A: from the Okmulgee county line, north approx 5.17 miles, to Kiefer (ut for 2442504) 2013 $400,030 0L240 $400,030 $0 $0 $400,030
Creek  TBD Sapulpa Urbanized STP   Intersection Main Street Signal Improvements and Coordination Implementation of coordinated signal system at five intersections, including various signal upgrades, signal installation at Bryan Street and replacement of signal at Main and Taft. 2013     $530,000 $0 $50,000 $580,000
Creek                       $1,431,430 $0 $50,000 $1,481,430
Osage  TBD Tulsa Urbanized STP   Grade, Drain & Surface Gilcrease West Expressway Edison St. to Tisdale Parkway Engineering, design, right-of-way, utility relocation, and construction of 2-lane parkway with shoulders and ultimate 4-lane access controlled expressway. 2011     $6,000,000 $0 $1,500,000 $7,500,000
Osage  TBD Tulsa Urbanized STP   Grade, Drain & Surface Gilcrease West Expressway Engineering design, right-of-way acquisition, utility relocation, and construction from Edison Street to LL Tisdale Parkway 2012     $6,000,000 $0 $1,500,000 $7,500,000
Osage  TBD Tulsa Urbanized STP   Grade, Drain & Surface Gilcrease West Expressway Engineering design, right-of-way acquisition, utility relocation, and construction from Edison Street to LL Tisdale Parkway 2013     $6,000,000 $0 $1,500,000 $7,500,000
Osage  27168(05) J2 -7168 (005) Surface Transportation Program 0.25 Right Of Way SH-20 SH-20: intersection at SH-20 & Jayvine hill road right of way for 27168(04) 2014 $100,000 0L240 $100,000 $0 $0 $100,000
Osage  27168(06) J2 -7168 (006) Surface Transportation Program 0.25 Utilities SH-20 SH-20: intersection at SH-20 & Jayvine hill road utilities for 27168(04) 2014 $100,000 0L240 $100,000 $0 $0 $100,000
Osage                       $18,200,000 $0 $4,500,000 $22,700,000
Rogers 20315(05) NHIY -0044-2(423) 238 RW National Highway 0.04 Right Of Way I-44 I-44: interchange at 163rd street in the city of Tulsa (right of way for 20315(04) IM earmark 2012 $4,558,000 0L050 $4,558,000 $0 $0 $4,558,000
Rogers 20315(06) NHIY -0044-2(424) 238 UT National Highway 0.04 Utilities I-44 I-44: interchange at 163rd street utilities for 20315(04) IM earmark 2012 $2,299,204 0L050 $2,299,204 $0 $0 $2,299,204
Rogers 21898(05) IMY -0044-2(485) 238 RW Interstate Maintenance 0.1 Right Of Way I-44 I-44: eastbound & westbound bridges at 177th east Ave. (Lynn lane) r/w for 21898(04) IM earmark 2012 $4,415,960 0L010 $4,415,960 $0 $0 $4,415,960
Rogers 21898(06) IMY -0044-2(486) 238 UT Interstate Maintenance 0.1 Utilities I-44 I-44: eastbound & westbound bridges at 177th east Ave. (Lynn lane) utilities for 21898(04) IM earmark 2012 $2,140,140 0L010 $2,140,140 $0 $0 $2,140,140
Rogers TBD Rogers County Urbanized STP   Grade, Drain & Surface 161st East Avenue/Pine Street Intersection Construct roadway with shoulders and signalization of intersection 2012     $720,000 $0 $180,000 $900,000
Rogers 21898(04) IMY -0044-2(437) 238 Interstate Maintenance 0.1 Bridge & Approaches I-44 I-44: eastbound & westbound bridges at 177th east Ave.(Lynn lane) IM earmark 2013 $9,810,000 0L010 $9,810,000 $0 $0 $9,810,000
Rogers 24957(05) J2 -4957 (005) Surface Transportation Program 0.49 Right Of Way SH-266 SH-266: Verdigris River overflow, 5.9 mile east of Tulsa County line right of way for 24957(04) 2013 $218,000 0L1C0 $218,000 $0 $0 $218,000
Rogers 24957(06) J2 -4957 (006) Surface Transportation Program 0.49 Utilities SH-266 SH-266: verdigrI- river overflow, 5.9 mile east of Tulsa county line Utilities for 24957(04) 2013 $109,000 0L1C0 $109,000 $0 $0 $109,000
Rogers 27167(04) J2 -7167 (004) Surface Transportation Program 0.1 Intersection SH--20 SH-20: intersection at SH-20 & clubhouse/Southaven road, approx. 9.5 miles east of Tulsa county line 2013 $3,000,770 0L240 $3,000,770 $0 $0 $3,000,770
Rogers TBD Catoosa Urbanized STP   Grade, Drain & Surface 161st East Avenue I-44 to Pine Reconstruction to 4-lanes, curb and gutter, storm sewer, intersection improvement at Pine including dedicated left turn lanes, concrete pavement and large turning radii. 2013     $1,731,382 $0 $998,689 $2,730,071
Rogers 09484(10) STPY -166B (241) Surface Transportation Program 4.83 Grade, Drain & Surface SH-20 SH-20: from approx. 1 mi east of the Verdigris River east to Claremore 2014 $20,300,000 0L240 $20,300,000 $0 $0 $20,300,000
Rogers 20315(04) IM-NHIY -0044-2(422) 238 Interstate Maintenance 0.4 Interchange I-44 I-44: interchange at 163rd Street split funding required IM earmark 2014 $10,500,000 0L010 and OL050 $10,500,000 $0 $0 $10,500,000
Rogers  27167(05) J2 -7167 (005) Surface Transportation Program 0.1 Right Of Way SH-20 SH-20: intersection at SH-20 & clubhouse/Southaven road, approx. 9.5 miles east of Tulsa county line (right of way for 27167(04) 2011 $257,500 0L240 $257,500 $0 $0 $257,500
Rogers  27167(06) J2 -7167 (006) Surface Transportation Program 0.1 Utilities SH-20 SH-20: intersection at SH-20 & clubhouse/Southaven road, approx. 9.5 miles east of Tulsa county line (utilities for 27167(04) 2011 $257,500 0L240 $257,500 $0 $0 $257,500
Rogers                      $60,317,456 $0 $1,178,689 $61,496,145
TMA 23185(08) J2 -3185 (008) Bridge 0 Bridge Water Proof Seal Various 2011 division 8 silane projects (bridges to be determined later) 2011 $103,000 0L1C0 $103,000 $0 $0 $103,000
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2011     $650,000 $0 $162,500 $812,500
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2012     $650,000 $0 $162,500 $812,500
TMA 23185(10) J2 -3185 (010) Bridge 1.2 Bridge Water Proof Seal Various 2013 division 8 silane projects (bridges to be determined later) 2013 $109,000 0L1C0 $109,000 $0 $0 $109,000
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2013     $650,000 $0 $162,500 $812,500
TMA 24348(04) J2 -4348 (004) Bridge 0.2 Bridge Painting Various Division 8: bridge paint and joint repair 2014 $500,000 0L1C0 $500,000 $0 $0 $500,000
TMA TBD   CMAQ   Congestion Mitigation and Air Quality Various Projects for reducing congestion and emissions to be selected by INCOG 2014     $650,000 $0 $162,500 $812,500
TMA                      $3,312,000 $0 $650,000 $3,962,000
Tulsa 06374(47) IMY -0044-2(399) 226 Interstate Maintenance 1.2 Grade, Draining, Bridge & Surface I-44 I-44: at Lewis Avenue (reconstruct to 6 lanes) ??Fund split?? IM earmark 2011 $51,697,928 0L010 and OL050 $51,697,928 $0 $0 $51,697,928
Tulsa 06374(82) J -6374 (082) Interstate Maintenance 1.06 Grade, Drain & Surface I-44 I-44: Darlington Avenue from just east of Yale to just west of Sheridan rd in Tulsa (roadway to 6 lanes)**funding agreement needed** 2011 $11,694,620 0L010 and OL051 $11,694,620 $0 $0 $11,694,620
Tulsa 11768(26) PL -0060 (036) IL Planning 0 Metro Planning PLAN State FY 2012 (July 1, 2011 -June 30, 2012) metro planning tulsa urbanized area 2011 $850,000 0L450 $850,000 $0 $212,500 $1,062,500
Tulsa 26505(04) STPY -172B (461) Surface Transportation Program 0.33 Grade, Drain & Surface SH-97 SH-97: from 2nd street south to Morrow Drive in Sand Springs 2011 $7,000,910 0L240 $7,000,910 $0 $0 $7,000,910
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2011     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2011     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2011     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2011     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2011     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2011     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2011     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2011     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2011     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2011     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2011     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2011     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2011     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2011     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2011     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2011     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2011     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2011     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2011     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2011     $500,000 $0 $220,000 $720,000
Tulsa TBD Jenks Urbanized STP   Grade, Drain & Surface Main St. from Elm St. to Koa St. Right-of-way and construction to widen to 4 to 5-lanes with sidewalks, drainage, and signage. 2011     $1,833,500 $0 $435,500 $2,269,000
Tulsa TBD Jenks Urbanized STP   Grade, Drain & Surface Main St. from US-75 to Houston St. Right-of-way and construction to widen to 4-lanes with sidewalks, drainage, and signage. 2011     $1,906,000 $0 $450,000 $2,356,000
Tulsa TBD Jenks Urbanized STP   Intersection Elwood Ave. and 111th St. Intersection Engineering, design, and right-of-way for construction of intersection to 4 to 5-lane roadway with turn lanes, bridge replacements, sidewalks, drainage improvements and signage. 2011     $512,000 $0 $128,000 $640,000
Tulsa TBD Sand Springs Urbanized STP   Grade, Drain & Surface SH-97(Wilson Ave.) from W. 2nd St. to Morrow Rd. Coneptula plans, right-of-way, and phase 1 utility relocation for ultimate widening to 6-lanes including 5 intersections, signailzation, and sidewalks. 2011     $1,600,000 $0 $400,000 $2,000,000
Tulsa 11768(27) PL -0060 (037) IL Planning 0 Metro Planning PLAN State FY 2013 (July 1, 2012 -June 30, 2013) metro planning tulsa urbanized area 2012 $850,000 0L450 $850,000 $0 $212,500 $1,062,500
Tulsa 21923(04) BRFY -172N (272) Bridge 0.05 Bridge & Approaches US-75 US-75: over south duck creek (aka middle duck creek), approx. 0.9 miles north of the Okmulgee county line 2012 $5,830,000 0L1C0 $5,830,000 $0 $0 $5,830,000
Tulsa 24300(04) NHY -014N (071) National Highway 0.5 Interchange US-75 US-75 interchange at 116th street north 2012 $7,950,000 0L050 $7,950,000 $0 $0 $7,950,000
Tulsa 26304(05) BHIY -0244-2(484) 005 Bridge 0.2 Bridge Rehabilitation I-244 I-244: 1-244/US-75 exit to 1st street (NE corner of IDL) IM earmark 2012 $6,700,715 0L1C0 $6,700,715 $0 $0 $6,700,715
Tulsa 27053(05) J2 -7053 (005) Surface Transportation Program 1.8 Right Of Way SH-266 SH-266: from approx. 0.3 mi. East of us169, ext. East approx. 2.25 miles (.45 mi. In Rogers co.) Row for 27053(04) 2012 $212,000 0L240 $212,000 $0 $0 $212,000
Tulsa 27053(06) J2 -7053 (006) Surface Transportation Program 1.8 Utilities SH-266 SH-266: from approx. 0.3 mi. East of us169, ext. East approx. 2.25 miles (.45 mi. In Rogers co.) Ut for 27053(04) 2012 $212,000 0L240 $212,000 $0 $0 $212,000
Tulsa 27066(05) J2 -7066 (005) Surface Transportation Program 0.25 Right Of Way SH-11 SH-11: Delaware creek, 11 mi. South of Washington county line right of way for 27066(04) 2012 $53,000 0L1C0 $53,000 $0 $0 $53,000
Tulsa 27066(06) J2 -7066 (006) Surface Transportation Program 250 Utilities SH-11 SH-11: Delaware creek, 11 mi. South of Washington county line Utilities for 27066(04) 2012 $53,000 0L1C0 $53,000 $0 $0 $53,000
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2012     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2012     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2012     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2012     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2012     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2012     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2012     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2012     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2012     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2012     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2012     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2012     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2012     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2012     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2012     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2012     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2012     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2012     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2012     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2012     $500,000 $0 $220,000 $720,000
Tulsa TBD Broken Arrow Urbanized STP   Grade, Drain & Surface 23rd (193rd) Street Widening 23rd to 3 lanes from Kenosha (71st) to Houston (81st) and replacement of the bridge over SH-51 2012     $1,377,931 $0 $344,483 $1,722,414
Tulsa TBD Jenks Urbanized STP   Intersection Elwood Ave/111th St. Intersection Widening intersection to 4-5 lanes, with turn lanes, signalization, and other improvements 2012     $1,728,600 $0 $402,000 $2,130,600
Tulsa TBD Jenks Urbanized STP   Grade, Drain & Surface Main Street Right-of-way acquisition and widening of Main Street to 4-5 lanes from Koa St. to Elwood Ave. 2012     $1,712,600 $0 $404,000 $2,116,600
Tulsa TBD MTTA Urbanized STP   Transit Capital  Shelters and Sidewalks Shelter and sidewalk improvments at various locations 2012     $30,000 $0 $10,000 $40,000
Tulsa TBD MTTA Urbanized STP   Transit Capital  Vehicle Acquisition Capital cost to acquire up to 25 public transit vehilces 2012     $577,323 $0 $144,331 $721,654
Tulsa 11476(04) BHFY -015N (008) Bridge 0.1 Bridge Rehabilitation SH--51 Tulsa: Broken Arrow Expressway /SH-51 over Lewis avenue (both bridges) scoping by 11477(05) to maintain br eligibility 2013 $3,727,800 0L1C0 $3,727,800 $0 $0 $3,727,800
Tulsa 11768(28) PL -0060-(038) IL Planning 0 Metro Planning PLAN State FY 2014 (July 1,2013 - June 30, 2014) metro planning Tulsa urbanized area 2013 $850,000 OL450 $850,000 $0 $212,500 $1,062,500
Tulsa 20931(05) NHY -030N (045) RW National Highway 0.5 Right Of Way US-169 US-169: interchange at Broken Arrow Expressway right of way for 20931(04) 2013 $4,005,750 0L050 $4,005,750 $0 $0 $4,005,750
Tulsa 20931(06) NHY -030N (046) UT National Highway 0.5 Utilities US-169 US-169: interchange at Broken Arrow Expressway Utilities for 20931(04) 2013 $1,504,200 0L050 $1,504,200 $0 $0 $1,504,200
Tulsa 21899(05) IMY -0044-2(487) 236 RW Interstate Maintenance 0.5 Right Of Way I-44 I-44: bridge at 145th east Ave. Approx. 0.7 mile east of jct of I-44/I-244 (r/w for 2189904) IM earmark 2013 $4,539,850 0L010 $4,539,850 $0 $0 $4,539,850
Tulsa 21899(06) IMY -0044-2(488) 236 UT Interstate Maintenance 0.5 Utilities I-44 I-44: bridge at 145th east Ave. Approx. 0.7 mile east of jct of I-44/I-244 (ut for 2189904) IM earmark 2013 $2,200,710 0L010 $2,200,710 $0 $0 $2,200,710
Tulsa 23167(04) BRFY -172A (319) Bridge 0.5 Bridge & Approaches SH-266 SH-266 over US-169 approx. 5.8 mile north of jct US-169/I-44. 2013 $3,815,000 0L1C0 $3,815,000 $0 $0 $3,815,000
Tulsa 23171(04) BRIY -0244-1(006) 101 Bridge 0.5 Bridge & Approaches I-244 I-244 over I-244 ramp w-n approx. 5.39 mile east of jct I-244/I-444. 2013 $1,863,900 0L1C0 $1,863,900 $0 $0 $1,863,900
Tulsa 24365(04) BRFY -172C (365) Bridge 0.5 Bridge & Approaches SH--11 SH-11: over Hominy Creek approx. 7.4 miles south of the Washington c/l 2013 $2,725,000 0L1C0 $2,725,000 $0 $0 $2,725,000
Tulsa 24365(07) BRFY -172B (368) Bridge 0.5 Bridge & Approaches SH--11 SH-11: over Flat Rock Creek, approx. 15.2 miles south of the Washington c/l 2013 $1,253,500 0L1C0 $1,253,500 $0 $0 $1,253,500
Tulsa 26303(08) J2 -6303 (008) Maintenance 1 Pavement Rehabilitation SH--51 SH-51: (Broken Arrow Exp.) From Peoria east to Lewis Ave. 2013 $7,380,390 0L050 $7,380,390 $0 $0 $7,380,390
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2013     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2013     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Capital Cost of Contracting 2013     $600,000 $0 $150,000 $750,000
Tulsa TBD   Transit   Transit Capital Transit Capital Leases 2013     $30,000 $0 $7,500 $37,500
Tulsa TBD   Transit   Transit Capital Transit Audit Services 2013     $50,000 $0 $12,500 $62,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - System Level 2013     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2013     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2013     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2013     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2013     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2013     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2013     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2013     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2013     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2013     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2013     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2013     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2013     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2013     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2013     $500,000 $0 $220,000 $720,000
Tulsa TBD Broken Arrow Urbanized STP   Grade, Drain & Surface 23rd Street from Kenosha to Houston  Widening of 23rd Street (193rd E. Ave) to 5-lanes and replacement of bridge to 4-lanes over SH-51. 2013     $2,499,982 $0 $624,996 $3,124,978
Tulsa TBD Jenks Urbanized STP   Intersection Main & Koa St. Signalization Engineering, design, and construction of signals including video detection and controls. 2013     $238,600 $0 $4,000 $242,600
Tulsa 10980(07) IMY -0044-2(361) 230 UT Interstate Maintenance 0.3 Utilities I-44 Tulsa: I-44 at Broken Arrow Expressway interchange Utilities for 10980(05) 2014 $2,019,000 0L010 $2,019,000 $0 $0 $2,019,000
Tulsa 10980(10) IMY -0044-2(360) 230 RW Interstate Maintenance 0.1 Right Of Way I-44 Tulsa: I-44 at Broken Arrow Expressway interchange right of way for 10980(05) state advance acquisition 10980(06) IM earmark 2014 $4,165,000 0L010 $4,165,000 $0 $0 $4,165,000
Tulsa 10981(06) IMY -0044-2(362) 233 RW Interstate Maintenance 0.3 Right Of Way I-44 Tulsa: I-44 at US-169 interchange right of way for 10981(05) 2014 $3,300,000 0L010 $3,300,000 $0 $0 $3,300,000
Tulsa 10981(07) IMY -0044-2(363) 233 UT Interstate Maintenance 0.3 Utilities I-44 Tulsa: I-44 at US-169 interchange utilities for 10981(05) IM earmark 2014 $2,018,000 0L010 $2,018,000 $0 $0 $2,018,000
Tulsa 11768(29) PL -0060 (039) IL Planning 0 Metro Planning PLAN State FY2015 (July 1, 2014 -June 30, 2015) metro planning Tulsa urbanized area 2014 $850,000 0L45E $850,000 $0 $212,500 $1,062,500
Tulsa TBD   Transit   Transit Capital Transit Preventative Maintenance 2014     $2,800,000 $0 $700,000 $3,500,000
Tulsa TBD   Transit   Transit Capital Transit Paratransit Expense 2014     $1,250,000 $0 $312,500 $1,562,500
Tulsa TBD   Transit   Transit Capital Transit Long Range Planning - Project Level 2014     $210,000 $0 $52,500 $262,500
Tulsa TBD   Transit   Transit Capital Transit Short Range Planning 2014     $220,000 $0 $55,000 $275,000
Tulsa TBD   Transit   Transit Capital Transit Program Support Administration 2014     $300,000 $0 $75,000 $375,000
Tulsa TBD   Transit   Transit Capital Transit Other Activities - MIS 2014     $174,000 $0 $43,500 $217,500
Tulsa TBD   Transit   Transit Capital Transit Other Activities - Staff Education and Training 2014     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit CMAQ - Outreach Activities 2014     $200,000 $0 $50,000 $250,000
Tulsa TBD   Transit   Transit Capital Transit Computer Hardware 2014     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Computer Software 2014     $100,000 $0 $25,000 $125,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Equipment 2014     $12,000 $0 $3,000 $15,000
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Shop Equipment 2014     $25,000 $0 $6,250 $31,250
Tulsa TBD   Transit   Transit Capital Transit Miscellaneous Office Furniture 2014     $10,000 $0 $2,500 $12,500
Tulsa TBD   Transit   Transit Capital Transit Security and Emergency Response Plans 2014     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Passenger Amenities 2014     $60,000 $0 $15,000 $75,000
Tulsa TBD   Transit   Transit Capital Transit Transit Coaches 2014     $500,000 $0 $220,000 $720,000
Tulsa                      $181,182,809 $0 $11,538,310 $192,721,119
Wagoner 20916(05) STPY -173C (088) RW Surface Transportation Program 1.77 Right Of Way SH--72 SH-72 beg approx 2.15 mile north of Muskogee c/l & ext north 1.77 mile(rw for 20916(04) 2013 $687,089 0L240 $687,089 $0 $0 $687,089
Wagoner 20916(06) STPY -173C (089) UT Surface Transportation Program 1.77 Utilities SH--72 SH-72 beg approx. 2.15 mile north of Muskogee c/l & ext. North 1.77 mile(ut for 20916(04) 2013 $497,708 0L240 $497,708 $0 $0 $497,708
Wagoner 27580(04) STPY -173A (164) 3R Surface Transportation Program 0.4 Resurface SH--72 SH-72: begin at Pecan Street in Coweta, extend north 0.4 miles 2013 $350,000 0L24E $350,000 $0 $0 $350,000
Wagoner                      $1,534,797 $0 $0 $1,534,797
Grand Total $265,978,492 $0 $17,916,999 $283,895,491