| ID | Contact Name | Title of Contact Person | Contact Email | Contact Phone | Sponsoring Entity | Address | Project Name | Project Description | ARRA Funding | Comments | Contingency | ODOT Award | ARRA Match | STP Match | ARRA Remainder | Award Date | Project Number | Federal Code |
| TUL07 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9653 | City of Tulsa | 2334 South Jackson Ave, S-103, Tulsa, OK 74107 | 064001-17B - Arterial Street Maintenance, (31st Street S from 129th E Ave to 145th E Ave) | Arterial Street Maintenance | $1,580,000 | #REF! | $552,769 | $516,454 | $36,316 | ######## | 8/3/2009 | 26706(04) | STP-STIM(287)IG | |
| TUL01 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9647 | City of Tulsa | 2328 South Jackson Ave, S-103, Tulsa, OK 74107 | 104001 - Arterial Street Maintenance, Mohawk Blvd (Cincinnati to Hartford) | Rehab of the street with AC Patching, PCC Patching, Driveways, Milling & Overlay along with new traffic signalization | $1,910,000 | #REF! | $736,057 | $687,730 | $48,327 | ######## | 8/3/2009 | 26700(04) | STP-STIM(281)IG | |
| City of Sand Springs | P.O. Box 338 Sand Springs, OK 74064 | E 2nd St (Main St to Adams - 3,200 lf) | Prepare existing pavement surface. Complete Pavement Preservation & Restripe pavement. | $313,283 | $198,130 | $185,046 | $13,084 | $128,237 | 8/3/2009 | 26697(06) | STP-STIM(422)IG | |||||||
| SAN01 | Douglas J. Enevoldsen | City Manager | djenevoldsen@sandspringsok.org | (918) 246-2502 | City of Sand Springs | P.O. Box 338 Sand Springs, OK 74063 | Airport Access Rd (Euchee Cr Blvd to NW - 16,500 lf) | Prepare existing pavement surface. Complete Pavement Preservation & Restripe pavement. | $608,137 | Sand Springs identified this project as their top priority. | Sand Springs included a 10% contingency. | $506,312 | $472,877 | $33,436 | $135,261 | 8/3/2009 | 26697(04) | STP-STIM(278)IG |
| SAP01 | Tom DeArman | City Manager | tdearman@cityofsapulpa.net | (918) 224-3040 | City of Sapulpa | 425 E. Dewey St. Sapulpa, OK 74066 | E. Line St. from Mission St. to Moccasin Pl. | Removing and replacing concrete pavement for a 2,560 foot stretch of E. Line St. from Mission St. to Moccasin Pl. Only the existing roadway foot print will be removed and replaced. | $698,540 | Sapulpa included 10% contingency | $482,705 | $450,828 | $31,877 | $247,713 | 9/8/2009 | 26698(04) | STP-STIM(279)IG | |
| BRK04 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Kenosha Street Mill and Overlay, Hickory Court to Aspen Avenue (145th E. Ave.) | Milling and 3" overlay on Kenosha Street (71st St. S.), a 5-lane primary arterial street in Broken Arrow, from Hickory Court to Aspen Avenue (145th E. Ave.), a distance of approximately 2,500 feet, to preserve the integrity of the roadway surface. | $344,804 | Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. | $316,912 | $295,984 | $20,928 | $48,820 | 9/8/2009 | 26687(04) | STP-STIM(267)IG | |
| BRK03 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Kenosha Street Mill and Overlay, Main Street to Sixth Street | Milling and 3" overlay on Kenosha Street (71st St. S.), a 5-lane primary arterial street in Broken Arrow, from Main Street to Sixth Street, a distance of approximately 2,000 feet, to preserve the integrity of the roadway surface. | $321,487 | Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. | $259,730 | $242,578 | $17,152 | $78,909 | 9/8/2009 | 26686(04) | STP-STIM(266)IG | |
| TUL09 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9636 | City of Tulsa | 2317 South Jackson Ave, S-103, Tulsa, OK 74107 | 054009 & 054039, Arterial Street Maintenance, East 41st Street South from I-44 to Sheridan Road | Arterial Street Maintenance, East 41st Street South from I-44 to Sheridan Roade and South Yale Avenue from 31st Street South to 36th Street South | $518,428 | Based on the Urbanized STP policy, Tulsa will be capped at $15,788,428 which is 70% of the available funding. | ######## | $0 | ######## | STP-STIM(289)IG | ||||
| TUL08 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9654 | City of Tulsa | 2335 South Jackson Ave, S-103, Tulsa, OK 74107 | 054024 - Arterial Street Maintenance, (Harvard Ave from 11th St to Admiral Pl) | Arterial Street Maintenance, Street mill & Overlay, New Sidewalk & Wheelchair ramps or replacement, recessed inlets | $2,127,000 | #REF! | $0 | 26707(04) | STP-STIM(288)IG | |||||
| TUL06 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9652 | City of Tulsa | 2333 South Jackson Ave, S-103, Tulsa, OK 74107 | 064001-17H - Arterial Street Maintenance, (S Sheridan from 11th to 21st St) | Arterial Street Maintenance, Pothole Repair, Minor sanitary sewer relocation, curbing, asphalt overlay | $2,960,000 | #REF! | $0 | 26705(04) | STP-STIM(286)IG | |||||
| TUL05 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9651 | City of Tulsa | 2332 South Jackson Ave, S-103, Tulsa, OK 74107 | 054045 - Arterial Street Maintenance, Roundabout (Mingo Rd & Admiral Pl) | Arterial Street Maintenance, Roundabout at Mingo Rd & Admiral Pl, Pothole Repair, additional drainage and asphalt overlay | $1,170,000 | #REF! | $0 | 26704(04) | STP-STIM(285)IG | |||||
| TUL04 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9650 | City of Tulsa | 2331 South Jackson Ave, S-103, Tulsa, OK 74107 | 054035 - Arterial Street Maintenance, Sheridan Rd(11th St to Admiral Blvd) | Arterial Street Maintenance | $1,875,000 | #REF! | $0 | 26703(04) | STP-STIM(284)IG | |||||
| TUL03 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9649 | City of Tulsa | 2330 South Jackson Ave, S-103, Tulsa, OK 74107 | 054037 - Arterial Street Maintenance, SW Blvd (23rd St to Arkansas Bridge) | Arterial Street Maintenance, Concrete Patching & Sidewalk Rehab | $2,033,000 | #REF! | $0 | 26702(04) | STP-STIM(283)IG | |||||
| TUL02 | Matt Liechti | Lead Engineer, Transportation Design | mliechti@ci.tulsa,ok.us | (918) 596-9648 | City of Tulsa | 2329 South Jackson Ave, S-103, Tulsa, OK 74107 | 054040 - Arterial Street Maintenance, Yale Ave (Admiral Pl to Pine St) | Arterial Street Maintenance | $1,615,000 | #REF! | $0 | 26701(04) | STP-STIM(282)IG | |||||
| TUC01 | Ray Jordan | Tulsa County Engineer | rjordan@tulsacounty.org | (918) 596-5730 | Tulsa County | 500 S Denver, Tulsa, OK 74103 | West 41st Street Improvements | 4-lane roadway improvement project on 41st Street S. from 41st W. Ave to 57th W. Ave. This project will connect to existing 4-lane roadways between 41st W. Ave and 57th W. Ave. Project will also provide traffic signal at 49th W. Ave and 41st Street S. which has an accident history in the past. This project would provide a 4-lane connection from I-44 to State Highway 97. | $640,422 | Due to equity distribution, the recommended funding is capped at $640,422 | $0 | 26699(04) | STP-STIM(280)IG | |||||
| ROC03 | Mike Helm | Rogers County District No. 2 Commissioner | mhelm@rogerscounty.org | (918) 443-2443 | Rogers County | 221 S. Missouri Room 1-109 Claremore, OK 74017 | Rogers County Pine Street Roadway Relocation | Approx. 0.7 miles East of SH-66 and East of Catoosa, OK on Pine Street over an abandoned portion of I-44. Construction of approx. 0.25 Mi. of a modern two-lane paved roadway. Project will allow for the abandonment of an existing single lane bridge over the abandoned turnpike US-44. | $63,553 | Due to equity distribution, the recommended funding is capped at $63,553 | $0 | 26696(04) | STP-STIM(277)IG | |||||
| JEN03 | Mike Tinker | City Manager | mtinker@jenksok.org | (918)299-5883 | City of Jenks | P.O. Box 2007 Jenks, OK 74037 | 5th Street Overlay | 5th Street (Levee to "A" Street): 2,600 LF of 2-lane curb and gutter roadway. Asphalt pavement rehabilitation by removal of surface course by grinding, installation of separator fabric and application of new 2-inch surface course with thermoplastic striping and reflectors. | $150,000 | Jenks included 15% contingency | $0 | 26695(04) | STP-STIM(276)IG | |||||
| COW02 | Kathleen Easley | Community Development Director | keasley@cityofcoweta-ok.gov | (918) 486-3773 | City of Coweta | P.O. Box 850 Coweta, OK 74429 | Asphalt overlay on 151st from Division to Broadway/Hwy 72 | Asphalt overlay on 151st from Division to Broadway/Hwy 72 to include materials and labor | $177,271 | Coweta requested a 2014 estimate. INCOG used the 2009 estimate provided by Coweta. | Coweta included a 15% conteingency. | $0 | 26694(04) | STP-STIM(274)IG | ||||
| COW01 | Kathleen Easley | Community Development Director | keasley@cityofcoweta-ok.gov | (918) 486-3773 | City of Coweta | P.O. Box 850 Coweta, OK 74429 | Traffic light improvements @ 141st & Hwy. 51 | Existing traffic light to be improved with new pull boxes, new signal cable, traffic controls, pedestrian push button and sign, pedestrian head mount and detectors | $21,146 | $0 | 26693(04) | STP-STIM(273)IG | ||||||
| CAT01 | Rita Lamkin | Mayor | mayorlamkin@cityofcatoosa.org | (918) 266-0806 | City of Catoosa | P.O. Box 190 Catoosa, OK 74015 | Cherokee & South School Access Road Traffic Signals | Add traffic signals to an existing intersection to improve safety and increase capacity | $219,935 | Project will need to meet warrants and Catoosa is prepared to proceed. | $0 | 26692(04) | STP-STIM(272)IG | |||||
| BRK10 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Signals at Elm Place and Stonewood Drive | Installation of Signals at Elm Place (161st E. Ave.) a primary arterial and Stonewood Drive commercial street. | $140,711 | Broken Arrow included a 8% Contingency and 4% for Engineering, plans, specs, and bidding. | $0 | 26691(04) | STP-STIM(271)IG | |||||
| BRK09 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Signls at New Orleans Street and 9th Street | Installation of Signals at New Orleans Street (101st St. S.) a primary arterial and 9th (S. 177th E. Ave.) Street a secondary arterial. | $140,711 | Broken Arrow included a 8% Contingency and 4% for Engineering, plans, specs, and bidding. | $0 | 26690(04) | STP-STIM(270)IG | |||||
| BRK08 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Signals at Albany Street and Stone Ridge Drive | Installation of Signals at Albany Street (61st St. S.) a secondary arterial and Stone Ridge Drive a commercial collector. | $140,711 | Broken Arrow included a 8% Contingency and 4% for Engineering, plans, specs, and bidding. | $0 | 26689(04) | STP-STIM(269)IG | |||||
| BRK05 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | 9th Street and Houston Street Intersection Mill and Overlay | Milling and 3" overlay of the 9th Street (S. 177th E. Ave.) and Houston Street (81st St. S.) intersection, a distance of approximately 2,000 feet on all 4 legs, to preserve the integrity of the roadway surface. 9th Street is a 5-lane secondary arterial street and Houston Street is a 3-lane secondary arterial street at the intersection. | $314,857 | Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. | $0 | 26688(04) | STP-STIM(268)IG | |||||
| BRK02 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Elm Place and Houston Street Intersection Mill and Overlay | Milling and 3" overlay of the Elm Place (161st E. Ave.) and Houston Street (81st St. S.) intersection, a distance of approximately 2,000 feet on all 4 legs, to preserve the integrity of the roadway surface. Elm Place is a 5-lane primary arterial street and Houston Street is a 3-lane secondary arterial street at the intersection. | $299,019 | Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. | $0 | 26685(04) | STP-STIM(265)IG | |||||
| BRK01 | Thomas D. Hendrix, P.E. | City Engineer | thendrix@brokenarrowok.gov | (918) 259-2400, Ext. 5414 | City of Broken Arrow | PO Box 610, Broken Arrow, OK 74013 | Elm Place Mill and Overlay, New Orleans Street to Florence Street including the Florence Intersection | Milling and 3" overlay on Elm Place (161st E. Ave.), a 4-lane primary arterial street in Broken Arrow, from Florence Street (111th St. S.) north to New Orleans Street (101st St. S.), a distance of approximately 5,000 feet, to preserve the integrity of the roadway surface. Milling and 3" overlay of the Elm Place (161st E. Ave.) and Florence Street (111th St. S.) intersection, a distance of approximately 2,000 feet on all 4 legs, to preserve the integrity of the roadway surface. | $1,257,450 | Broken Arrow included a 25% Contingency and 4% for Engineering, plans, specs, and bidding. | $0 | 26684(04) | STP-STIM(264)IG | |||||
| BIX01 | Micky Webb | City Manager | mwebb@bixby.com | (918) 366-4430 | City of Bixby | 116 W. Needles, Bixby, OK 74008 | E. 131st Street and Memorial Intersection Widening | Proposed construction included widening the east and west legs of the 131st and Memorial intersection from 2-lanes to 5-lanes. The work will extend approximately 750-feet in each direction and include paving and drainage improvements. Upon completion, the project will increase the level of service for east/west bound traffic, reducing congestion at the intersection. | $538,000 | Due to equity distribution, the recommended funding is capped at $538,000 | Bixby included no contingency | $0 | 26683(04) | STP-STIM(263)IG | ||||
| CRK01 | Marilyn Smithee | Office Director | msmithee@swbell.net | (918) 224-0278 | Creek County | 317 E. Lee, Suite 103 Sapulpa, OK 74066 | West 81st Street South from SH-66 West to Frankhoma Road | Widening of an existing road from 2-lanes with open ditches to 3-lanes with curbs and storm sewers. Includes replacing obsolete drainage boxes as well as horizontal & vertical curve corrections. The 3rd lane will be a two-way left turn lane to service a growing industrial park area that also includes residential traffic. | $376,431 | Due to equity distribution, the recommended funding is capped at $376,431 | $0 | 22350(04) | STP-STIM(275)IG | |||||
| $3,052,615 | $2,851,496 | $201,120 | ######## |